施工强制性条文实施细那么
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate siurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured- 4 -
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
施工单位:葛洲坝集团电力有限责任公司
二0一四年十月
批 准: 年 月 日
〔施工单位总工〕
审 核: 年 月 日
〔施工单位工程技术部门〕
审 核: 年 月 日
〔施工单位质量平安管理部门〕
编 写: 年 月 日
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors
最新施工强制性条文实施细则 来自beplayapp体育下载www.apt-nc.com转载请标明出处.